September 2023 Update
We’re excited to share September’s news on our ODOM project. Each month we aim to provide insights and break down the technicalities of our progress in a way that is easy to grasp.
ODOM’s piling work is ongoing, with 2 test piles fully completed. After the showroom’s demolition showroom in August, the third and final test pile was installed. This last pile is now waiting for the concrete to harden before it can be tested. This process will take between 3 to 4 weeks. However, the remaining piles will move much faster since they do not need to be tested.
At the same time, ODOM’s construction team has begun working on the basement walls for the structures. The first step consists of building a guide wall which will act like a ruler to guide the excavation. The East and South side Guide Walls are already completed, with soil excavation for other walls underway. After finishing the soil removal and setting up the guide wall on the North side, the team will move to the West side next. The basement walls play a crucial role in the project because they are the ones that ensure the stability and safety of the entire structure.
We invite you to stay connected as we shape the future of Odom. Watch out for more updates on the ODOM website!